A short Project filmed on my lunch break.
I was asked by Kenko to help out with a small project.
We grabbed a couple models for Too Much Metal Fred and headed to a rooftop. Everything shot on just an iPhone6+ for the high frame rate. Kenko handled the editing and pacing
I handled the filming and D.I.T. duties.
It was shot and the footage was delivered for editing within an hour. Not bad for a lunch break.